Current Projects – Florida

Woodruff & Sons, Inc. is well known in Northern Indiana and West-Central Florida for our quality work in the areas of sanitary sewer installation, water main construction, storm drainage improvements, earthmoving, site development, road construction, demolition and design build.

Our projects over the years speak for themselves.

Please click on the menu below to view past and current Woodruff & Sons, Inc. Projects.

Waterside Place Park

Woodruff & Sons, Inc. is working for Lakewood Ranch Stewardship District in constructing the entry road and park for Lakewood Ranch’s new Waterside Place downtown district. The park is to include playground, splash park, volleyball courts, event lawn, walking path, and a pedestrian bridge to the restaurants and retail area.

Rubonia Water Quality Improvements

Manatee County awarded Woodruff & Sons, Inc. the Rubonia Water Quality Improvements project. Located throughout the neighborhoods of Rubonia this storm drainage improvement project will relieve the constant flooding even a heavy rain event brings far less a storm event. The storm sewer improvements consist of thousands of feet of reinforced concrete pipe as well as corrugated PVC pipe, and over a hundred structures including two large baffle boxes that filters the runoff water before it eventually finds its way to a navigatable waterway. Along with storm sewer improvements this project also includes water and sewer utilities, curb, sidewalk and pavement repairs.

Cypress St Outfall Regional Stormwater Improvements Design Build

Woodruff & Sons, Inc. along with the engineering firm Tetra Tech are the design-build team for City of Tampa’s Cypress Street Outfall Regional Stormwater Improvements Project. Flooding was a reoccurring theme during the rainy seasons of the West Riverfront and North Hyde Park Districts with the City of Tampa. Box culverts were designed and installed to alleviate the flooding situation while improvements to the water main distribution system, sanitary sewer systems, and roadway as well as a new 36” water transmission main and installation of the Green Spine bicycle path.

44th Avenue East From 45th Street East to I-75

Woodruff & Sons, Inc. was awarded the next segment of Manatee Counties East-West corridor of 44th Ave East. This section includes a 1,500 linear foot bridge over Braden River and will complete 44th Avenue from the West all the way up to I-75. Along with the roadway and bridge construction, enhancements are being made to the capacities of the water main and force main utilities as well as upgrading the storm sewer system with the project limits.

Bayside Community Church North River Campus

Bayside Community Church is well established within West and East Bradenton and Woodruff & Sons, Inc. is proud to help expand their Community to Parrish with the construction of their North River Campus. Woodruff & Sons, Inc. will preform the clearing and grubbing, earthwork, storm sewer, underground utilities, and roadwork for Bayside Community Church and their general contractor Halfacre Construction.

Morgan’s Glen Subdivision

Parrish is a vastly growing area within Southwest Florida and the subdivision of Morgan’s Glen will be a staple within the community for decades to come. A Neal Communities development, Woodruff & Sons, Inc. was tasked with the clearing and grubbing, earthwork, storm sewer system, underground utilities, lift station, and roadway scopes of work.

Testimonials